FREE ONLINE ESTIMATE

Friend GraniteDirect on Facebook Follow GraniteDirect on Twitter Watch GraniteDirect on YouTube

 

estimatesSpecials

Our Process

 

Template

Step One

Once an order has been placed, a template will be scheduled for an installer to visit the site and take exact measurements for fabrication. At this time, final seam placement should be discussed as well as any modifications to cabinetry, flooring, or walls that might prevent the granite from being installed properly. It is mandatory that all customer supplied sinks be available at the time of template. The paper template included with the sink, or the sink itself will need to be brought to the fabrication facility in order to ensure the accuracy of the cut-outs. Depending on the layout and complexity of the job the template can range from simple dimensions to a hard template of the current countertop or cabinets to ensure accuracy before cutting. It is important to remember that the final sale price may change due to an increase in square footage following the template.

 

                               

Fabrication

Step Two

The template that was made by the installer is then passed off to the production team to be laid out on the slab(s) for fabrication. A bridge saw using diamond-tipped blades precisely cuts the granite to the specifications of the template. Once all cutting is complete, the countertops will move through production receiving sink cut-outs and metal rods for support, along with edge detailing and polishing. Once fabrication is complete, the countertops should be measured again to account for accuracy before being handed off to a crew for installation. Drop-in and vessel sinks, cook-tops, outlets, and faucet/cord holes are all drilled on-site at the time of installation.

 

                               

Installation

Step Three

Install time can vary significantly depending on the size and dynamics of the job. On average, vanity and bar tops can be completed in as little as 1 hour, with a standard kitchen install lasting 3-4 hours. If there is tear-out, on site cut-outs, or a more complex layout, installs can last longer than 4 hours. All appliances and faucets must be on-site at the time of install. Seams are filled with an adhesive bonding agent and left to set, and they are color-matched to the stone in order to minimize their appearance. Dishwasher brackets will be used to secure them to the cabinetry/stone. Undermount sinks are secured using an epoxy and clamping method in order to the let the chemicals set prior to the installer leaving. Sinks do require a full 24 hours to set properly before reconnection. Finally, the granite will be cleaned and sealed before the installer leaves the site.

 

 

Home | About Us | Contact Us | Locations | Career Opportunities | Authorized Retailer Opportunities | Events & Contests | Selection Center